Yes but we don't seem to have any standard minimum 9" from the breech.
I would prefer a standard minimum at the junction of the chamber/taper and/or 1 inch from the breech face as pressure falls away rapidly after this point.
I cannot help but wonder why the proof house is so hung up on bore diameter.
You are never going to blow up a barrel at the chamber because the bore has been honed out.