Tamid,
If the filing was, as I suspected, to adjust the POI of the pattern, there is no doubt the problem would have been verified by patterning, and patterning would have been performed to gauge the progress of work. Any adjustment would have been for a particular load and different loads might vary.
Mike

Last edited by Der Ami; 04/16/20 09:14 AM.